What a monitoring plan has to contain
An operator who determines emissions at installation level designs and implements a monitoring plan. The implementing regulation sets the minimum content of that plan as a template of twenty two points, and the plan is submitted in English.
Where the obligation comes from
Article 5(5) requires the plan and sends its content to point A.5 of Annex II. Article 5(6) requires the plan to be submitted in English. The template below holds 22 numbered points and 36 entries in all, and it is the minimum rather than the whole of what a plan may carry.
A plan that leaves out one of these points is incomplete on the face of the regulation, and the verifier reads the plan before reading the figures that rest on it.
The twenty two points of the template
- The date of the monitoring plan and its version number.
- A description of the installation and of the production processes it carries out.
- A list of every relevant good produced, by commodity code and functional unit, with the specific compositions in clinker content and nitrogen content where those apply, including precursors that are not covered by a separate production process under Article 4.
- A list of every production process and production route carried out at the installation, with the goods delivered by each process.
- A list of the goods produced that fall outside the mechanism, by production process, with the quantity produced, where there are any.
- A list of the benchmarks to be used to determine the free allocation adjustment for each relevant good produced.
- The methods for monitoring the data of each production process, which cover two things.
- A detailed description of the calculation based methodology where it is used, with a list of the input data and the calculation formulae.
- A description of the measurement systems used, and the exact location of the measuring instruments for each source stream monitored.
- The methods for determining the calculation factors, and the sampling plan for each source stream, where those apply.
- A list of the source streams and the emission sources for each production process, with a description of each.
- A list of the source streams for which the standard method or the mass balance method is used, with a detailed description of how each relevant parameter under point B.3.4 is determined.
- A list of the emission sources for which a measurement based methodology is used, with a description of the elements under point B.6.
- A description of the monitoring methodology for perfluorocarbons, so far as perfluorocarbons from primary aluminium production are monitored.
- A diagram and a process description of the installation, showing the system boundaries of the installation and of each production process, and evidencing that the emissions of the installation are neither counted twice nor left out.
- The precursors used in each production process and, where a precursor is produced in another installation, the name of the supplier and its country of origin.
- Whether any zero rated fuels are used, and how the operator demonstrates that the zero rating applies to them.
- Whether measurable heat is imported from or exported to other installations, which installations those are, and a detailed description of the methods used to determine the emissions attributed to the heat flows of each production process.
- For indirect emissions, whether electricity is produced inside the installation and, where it is, four further points.
- Whether it is produced by cogeneration.
- Whether it is produced by separate generation.
- Whether it is produced from fossil or from renewable sources.
- Whether it is exported from the system boundaries of a production process.
- Where indirect emissions rest on actual emissions, the information needed to provide the relevant parts of the evidence under point D.4.3.
- Where the embedded emissions of electricity imported into the customs territory of the Union rest on actual emissions, the information needed to provide the evidence under point D.2.4, including, where the operator does not hold that information directly, how the operator plans to obtain it.
- Whether waste gases are produced and used in the installation, or imported from or exported to other installations, and which installations those are.
- Whether carbon dioxide is captured, stored or used under point B.8.2 and, where it is, the identity and contact details of a responsible person at the receiving installation, transport infrastructure or entity, and the monitoring methodology under point B.8.3.
- A control system to secure the quality of the data, which covers the following where they apply.
- Quality assurance of the measurement equipment, so that every relevant instrument is calibrated, adjusted and checked at regular intervals and before use, and checked against measurement standards traceable to international standards where those exist, in proportion to how much the instrument matters.
- A risk assessment identifying the sources of the risk of error in the flow of data from the primary figures to the final ones.
- Quality assurance of the information technology systems, so that they are designed, documented, tested, implemented, controlled and maintained in a way that processes reliable, accurate and timely data in line with the risks identified.
- Segregation of duties across the data flow activities and the control activities, and management of the competencies those need.
- Internal reviews and validation of the data.
- Corrections and corrective action.
- Control of outsourced processes.
- Record keeping and documentation, including the management of document versions.
What decides the methods the plan records
Several points of the template ask which method the operator uses and which data source it rests on. Those are not free choices. The ranking of data sources, the two monitoring methodologies and the tests of technical feasibility and unreasonable cost are set out on the page on how a figure is monitored.
One slip in the published text of this point
The second entry under point 22 prints the word assessment without its second s. The entry is readable, and it is recorded here because this library states what a text says. Read in the Official Journal text on 13 October 2026.