Calculation

How a figure is monitored and when cost excuses a method

The method an operator uses is not a free choice. The implementing regulation sets what has to be covered, the two methodologies that are allowed, a ranking of data sources, and two tests that decide when an operator may stay with a weaker source.

Read on 13 October 2026.

What the monitoring has to cover

The boundaries of the installation and of its production processes are known to the operator and defined in the monitoring plan. Point B.1 then sets three principles. Every relevant emission source and source stream linked directly or indirectly to the production of the goods is covered, as a minimum. Every emission from regular operation is included, and so is every emission from an abnormal event, among them start-up, shut-down and an emergency, across the reporting period. Emissions from mobile machinery used for transport are left out.

The two methodologies the regulation allows

The calculation based methodology determines the emissions of a source stream from activity data obtained by measurement, with further parameters from laboratory analyses or from standard values. It runs either as the standard method or as the mass balance method.

The measurement based methodology determines the emissions of an emission source by measuring the concentration of the greenhouse gas in the flue gas continuously, together with the flue gas flow.

The operator chooses the methodology that gives the most accurate and reliable result, unless a sector specific requirement in point B.9 calls for one in particular. The two may be combined, so that different parts of the emissions of an installation are monitored in different ways, and the emissions of the installation are the sum of what each methodology produces.

The ranking of data sources

Point A.3 sets one overarching principle, which is that the best available data source is always selected, and it then gives the guiding principles that decide which source that is.

Where no direct method exists for a data set, which the annex illustrates with net measurable heat going into different production processes, an indirect method may be used. It may rest on a calculation from a known chemical or physical process using accepted literature values, on a calculation from the design data of the installation such as the energy efficiency of a unit, or on a correlation from empirical tests. A correlation has to satisfy good engineering practice, it is applied only within the range it was established for, and its validity is evaluated at least once a year.

How the ranking is applied over time

The operator takes the source highest in the ranking that the installation already has. Where a higher source is technically feasible without unreasonable cost, the operator moves to it without undue delay. Where two sources sit at the same level, the one chosen is the one that gives the clearest data flow with the lowest inherent risk and control risk of misstatement.

The sources chosen are written into the monitoring plan. So far as it is feasible without unreasonable cost, further sources or methods are identified so that the chosen ones can be corroborated, and those are written into the plan as well. The operator checks at least once a year whether a new source has become available, and where a new source is more accurate under the ranking it goes into the plan and is applied from the earliest possible date.

The two excuses, and what each has to show

An operator who claims that a methodology is not technically feasible writes the justification into the monitoring plan, and reassesses it at the annual check. The justification turns on whether the installation has technical resources able to meet the needs of the proposed source or method within the time required, and those resources include the availability of the techniques and the technology.

An operator who claims that a methodology costs too much writes that justification into the plan as well, and reassesses it at the same check. The regulation then fixes the arithmetic rather than leaving it to argument.

The two tests are written down, dated and reassessed every year. An operator who relies on either one without recording it in the monitoring plan has no answer to give the verifier.

What each method needs for each source stream

Point B.3.4 sets, for each method, the parameters that have to be determined for a source stream. It separates the minimum from the improvement it recommends, so an operator can see what a better figure would cost.

MethodMinimum requirementRecommended improvement
The standard method, for combustionThe quantity of fuel and the emission factor.The quantity of fuel, the net calorific value, the emission factor, the oxidation factor, the biomass fraction and the evidence that the biomass criteria are met.
The standard method, for process emissionsThe activity data and the emission factor.The activity data, the emission factor and the conversion factor.
The mass balance methodThe quantity of material and its carbon content.The quantity of material, its carbon content, the net calorific value, the biomass fraction and the evidence that the biomass criteria are met.

When biomass counts as zero

Biomass burned as a fuel carries zero only where it meets the criteria of point B.3.3. Where it does not, its carbon counts as fossil carbon, and the figure moves accordingly.

How a quantity is metered across a reporting period

Point B.4.1 gives two ways of determining the quantity of a fuel or a material over the period, and the one chosen is written into the monitoring plan. The first is continual metering at the process where the material is consumed or produced. The second aggregates the quantities delivered or produced batch by batch, and it accounts for the change in stock.

On the second route, the quantity consumed during the period is the quantity imported during the period, less the quantity exported, plus the quantity in stock at the start of the period, less the quantity in stock at the end of it.

When a group of goods forms one production process

Point A.4 covers the case of a plant making many shapes of the same thing. For goods in the categories for crude steel, iron or steel products, unwrought aluminium and aluminium products, where functional units differ only in size or shape and are produced from the same precursors in the same types, quantities and proportions, a single multifunctional production process is defined for that group, and the attribution rules of point A.2 of Annex III apply to it.

For goods in the fertiliser categories the same follows, where the functional units are produced from the same precursors in the same types, quantities and proportions, or are composed of the same substance and differ only in concentration.

How measurable heat is counted

Every quantity of measurable heat is a net quantity. It is the heat content of the flow transmitted to the heat consuming process or the external user, less the heat content of the return flow. The heat consuming processes that keep the heat production and distribution running, among them deaerators, the preparation of make-up water and regular blow offs, count in the efficiency of the heat system and reach the embedded emissions of the goods through it.

Where one heat medium passes through several processes in turn and each consumes heat from a different temperature, the quantity each process consumes is determined separately, unless those processes belong to the overall production process of the same goods. Reheating the medium between two of them is treated as further heat production. Where heat drives an absorption cooling process, that cooling process is the heat consuming process.

Three methods determine the net quantity. The first measures the parameters, among them the temperature, the pressure and the state of the transmitted and returned medium, together with the flow rate, and derives the enthalpy and the specific volume from steam tables or engineering software. The second calculates from the fuel input and the measured efficiency of heat production and transmission, with an annual load factor to account for the part load curve. The third follows the second but applies a reference efficiency of 70 per cent.

Two assumptions are fixed rather than left to the operator. Where steam or hot water is the medium and the condensate is not returned, or where it is not feasible to put a figure on the enthalpy of the returned condensate, the return is determined on a temperature of 90 degrees Celsius. The efficiency used in the second method rests on a situation in which all condensate is returned, again at 90 degrees Celsius.

Heat an installation consumes that was produced by an exothermic chemical process other than combustion, as heat is produced in making ammonia or nitric acid, is determined separately from other measurable heat and carries zero emissions.

One slip in the published text of point C

Point C.1.2.3 introduces the third method by saying that it is identical to method 3, where the method it is identical to is the second one, which it then varies by applying the reference efficiency. Read in the Official Journal text on 13 October 2026.